SpaceX wireless
filings tracker

SpaceX is assembling the rights. The next test is turning them into dependable service.

The starting point

Baseline and latest observation · Nov 13, 2026

Tracked acquisitions closed

0 of 2

Grain and the final EchoStar transfer. [1] [3]

800 MHz satellite permission

Pending

No grant recorded for this application. [8]

Dependable service

Unscored

Comparable operating evidence still needed. Basis ↓

Definitions and evidence thresholds ↓

Where things stand

Four selected U.S. proceedings · Open a record for details
01

Grain spectrum

In public review

The FCC accepted the applications to transfer control of 546 licenses to Starlink Spectrum Holdings, a SpaceX subsidiary. This starts public review; it does not approve the purchase. [1] [5] [7] [9]

What comes next

Comments and petitions: December 1, 2026. Oppositions: December 8, 2026.

Why it matters

Would add a low-band coverage layer to SpaceX’s wireless plans. The license footprint does not measure a working network.

The transfer concerns control of Prism License Co. 1 and Prism License Co. 2. If approved, the conditions imposed in the July T-Mobile–Grain order would follow the licenses. The satellite-use request is tracked separately below. Public comments were posted to the docket on November 12. The latest FCC action listed at this review remains the November 10 acceptance notice.

WT 26-313 · ULS 0012212612 / 0012212635
Source record: Nov 10, 2026 · Reviewed November 13, 2026

02

800 MHz satellite use

Pending payment

SpaceX filed a separate modification and waiver request on October 27 to add domestic supplemental coverage from space. The FCC application record lists “Pending Payment,” with no grant or last action recorded. [1] [8]

What comes next

Watch for an FCC action on the modification and waivers. The Grain transfer’s comment dates are not assigned to this application here.

Why it matters

Buying spectrum and receiving permission to use it from satellites answer different questions.

The application seeks to modify the existing Starlink Mobile satellite authorization. It concerns the same Grain spectrum, not additional bandwidth. ICFS shows a status date of October 27; the November 10 transfer notice also describes the request as pending.

ICFS SAT-MOD-20261021-00406
Source record: Oct 27, 2026 · Reviewed November 13, 2026

03

EchoStar spectrum

Approved; final transfer ahead

The FCC approved the two-step assignment in May. EchoStar reports that the first transfer, to Spectrum Business Trust 2025-1, closed May 22. Its November filing still targets November 30, 2027 for the final transfer to SpaceX. [2] [3] [10]

What comes next

Final acquisition closing, subject to the agreement’s conditions. November 30, 2027 is a company target, not an FCC decision deadline.

Why it matters

Regulatory approval and final ownership are separate milestones. The trust stage matters for the operating conditions in the satellite order.

The FCC order covers spectrum and several earth-station licenses. The approximately 65 MHz figure is the regulator’s transaction description, not a measure of speed, usable capacity everywhere or current commercial service. A July 30 FCC order clarified and modified a separate creditor-payment fund condition. That fund is distinct from the trust holding the spectrum licenses.

GN 25-302 · FCC DA 26-471
Source record: Nov 3, 2026 · Reviewed November 13, 2026

04

Starlink Mobile satellites

Granted in part, with conditions

The FCC granted part of the direct-to-device constellation application and deferred part. Operational authority in the EchoStar-related bands is conditioned on the second transaction step closing. [4]

What comes next

Watch for the final EchoStar transfer and subsequent authorization changes. Deployment and service performance require separate evidence.

Why it matters

The satellite count is an authorized constellation size. It is not a count of launched satellites or phones being served.

ICFS SAT-LOA-20250916-00282 and SAT-AMD-20251125-00339. Footnote 2 distinguishes commercial operational authority in the relevant bands from permitted deployment, early-orbit operations and payload testing with EchoStar and trust consent. The separate 800 MHz application must be assessed on its own record.

GN 25-340 · Call sign S00735
Source record: Oct 6, 2026 · Reviewed November 13, 2026

The wireless thesis

BTF assessment · Nov 13, 2026

The rights are taking shape.
The service test remains open.

Our test is a hybrid network that can serve customers reliably at a sustainable cost. Deals and permissions clear prerequisites; they do not establish that outcome. [11] [12]

Control the spectrum

Count completed acquisitions, not announcements or approvals. The two tracked final transfers remain ahead. [1] [3]

Ownership record ↓

Use it from space

Read the conditions, not just the grant. EchoStar-band operation remains conditional; the 800 MHz request is separate. [4] [8]

Permission record ↓

Deliver dependable service

Look for indoor reliability, performance under load and credible ground-network costs. This record cannot yet score that test. [12] [13]

What would count ↓
Benchmark definitions +

A fixed starting point

November 13, 2026 is the launch baseline. This edition has one observation, so baseline and latest are the same. Future readings should preserve this baseline and show dated changes; this page does not imply progress since launch.

MeasureBaseline · Nov 13Latest · Nov 13Change
Final acquisitions0 of 20 of 2First observation
800 MHz permissionPendingPendingFirst observation
Service performanceUnscoredUnscoredNo comparable reading

What clears each benchmark

Ownership: official evidence that both named final acquisitions have closed. The count is BTF’s calculation: Grain 0 + final EchoStar acquisition 0 = 0 of 2. EchoStar’s May trust transfer is an intermediate step. This is not a network-completion percentage or a tally of all SpaceX spectrum holdings. [1] [3]

Permission: an FCC grant covering the proposed 800 MHz satellite use, with its effective scope and conditions identified. The current ICFS label is “Pending Payment”; neither payment nor an application alone grants operating authority. [8]

Service: documented indoor reliability and busy-hour performance, alongside deployment and cost evidence. These are BTF’s qualitative evidence tests, not regulatory requirements or a numerical break-even model. We have not set a defensible numerical pass mark from these sources. [12] [13]

Comparison and pace

A peer comparison needs the same geography, handset capabilities, service type, test period and load conditions. A demonstration, a coverage footprint and a commercial service are different observations. The reviewed sources do not support a matched ranking, so none is shown. Missing evidence is not zero performance. [14]

EchoStar’s November 30, 2027 closing target is a conditional company target, not an FCC deadline. It is not enough to label the wider wireless plan ahead of or behind schedule. [3]

Keep company targets, measured results and BTF calculations separate. Do not combine these three tests into an overall progress score.

Download the benchmark definitions ↓
Sources & methodology +

Four selected U.S. proceedings. Status reflects each cited record, not a real-time docket feed. Routine earth-station filings, foreign approvals and the full T-Mobile authorization history are outside this edition.

Records checked November 13, 2026. FCC decisions, company targets and BTF interpretation are distinguished in the record details. Review dates do not imply a new regulatory event.

  1. FCC: Grain transfer accepted for filing ↗

    Nov 10, 2026. DA 26-1218, pp. 1–2 and footnotes 1–4. WT Docket 26-313.

  2. FCC: EchoStar spectrum assignment order ↗

    May 12, 2026. DA 26-471, paragraphs 1, 11–12 and footnote 1. GN Docket 25-302.

  3. EchoStar: third-quarter Form 10-Q ↗

    Nov 3, 2026. Note 1, Recent Developments, “SpaceX Transactions Closing Updates.” Quarter ended September 30, 2026.

  4. FCC: SpaceX direct-to-device constellation order ↗

    Oct 6, 2026. DA 26-1078, grant table, pp. 1–2 and footnote 2 continuing on p. 2. GN Docket 25-340.

  5. FCC: T-Mobile to Grain assignment order ↗

    Jul 1, 2026. DA 26-653, paragraphs 3 and 44–48. WT Docket 25-178.

  6. SpaceX: Grain transaction public-interest statement ↗

    Oct 9, 2026. Sections III and IV.B–D; printed pp. 3–10. Document dated October 8, filed October 9. Applicant statements describe plans.

  7. Grain: definitive agreement announcement ↗

    Oct 8, 2026. Opening paragraphs: proposed sale of entire 800 MHz portfolio, subject to FCC approval and closing conditions.

  8. FCC ICFS: 800 MHz satellite application ↗

    Oct 27, 2026. Application Information: status, status date, last action and grant date. Read November 13, 2026.

  9. FCC ECFS: Grain transfer docket ↗

    Nov 12, 2026. WT 26-313, filings sorted by posted date and FCC Actions. Read November 13, 2026.

  10. FCC: EchoStar creditor-payment fund clarification ↗

    Jul 30, 2026. DA 26-797, paragraphs 2 and 5–9. Clarification and modification of the separate fund condition.

  11. BTF: The Last Piece of the Puzzle ↗

    Nov 10, 2026. Public summary: Hybrid-network thesis and evidence to watch. These reports supply the analytical framework, not independent measurements.

  12. BTF: The Invisible Frontier ↗

    Nov 12, 2026. Public summary: Capacity, indoor performance and the limits of efficiency claims. These reports supply the analytical framework, not independent measurements.

  13. BTF: Build or Buy ↗

    Nov 10, 2026. Public summary: Binding infrastructure commitments and economic tradeoffs. These reports supply the analytical framework, not independent measurements.

  14. BTF: The Counterattack ↗

    Nov 12, 2026. Public summary: Technical demonstrations versus dependable commercial service. These reports supply the analytical framework, not independent measurements.

Download the four-record dataset ↓
Timeline & update history +
  1. EchoStar assignment approved
    FCC approves the two-step spectrum transaction. [2]

  2. First EchoStar transfer closes
    Licenses move to the trust, as later reported by EchoStar. [3]

  3. Grain receives conditional approval
    The earlier T-Mobile–Grain order establishes obligations that follow the licenses. [5]

  4. Creditor fund condition clarified
    FCC modifies a separate creditor-payment fund condition attached to the EchoStar transactions. [10]

  5. Constellation granted in part
    The order authorizes 15,000 satellites, with conditions and deferred requests. [4]

  6. Grain announces sale agreement
    SpaceX agrees to buy the portfolio, subject to approval and closing conditions. [7]

  7. Grain transfer applications filed
    Transfer of control is requested for the two license-holding companies. [1]

  8. 800 MHz satellite request filed
    A separate application seeks satellite-use authority and waivers. [1]

  9. Grain applications accepted for filing
    Public review opens, with December pleading deadlines. [1]

  10. Grain public comments posted
    Public review continues; comments are not an FCC approval. [9]

November 13, 2026: fixed launch baseline and three benchmark definitions introduced. Filing observations remain the November 13 snapshot. The historical events above do not imply earlier tracker observations.

Understanding the spectrum +

800 MHz is the band.
14 MHz is the maximum bandwidth.

817–824 MHzUp to 7 MHz
862–869 MHzUp to 7 MHz

(824 − 817) + (869 − 862) = 14 MHz combined at the maximum. Width varies by licensed area. The satellite-use application concerns the same Grain spectrum; it is not additional bandwidth. [5] [1]

SpaceX describes a hybrid network with ground radios on towers and rooftops alongside satellites. BTF’s commercial test is dependable indoor service, busy-hour performance and a deployment plan whose costs can be supported by customers. [6]

Dalton owns SpaceX shares, confirmed November 8, 2026. Analysis dated November 13, 2026. General research, not personalized investment advice. Editorial standards · Terms

The Future of Wireless

The research behind the record.

Explore the series ↗

There is more to the story.
Keep reading with us.

Explore membership